Panels and renovations
Homes here range from long-established communities to new subdivisions. We assess the existing service before a renovation, heat pump or charger goes in.
Residential electricalConception Bay South is home base for Puffin Power. We wire homes and commercial buildings across the town, with the permit and the inspection handled for you.
The 2021 census counted 11,364 private dwellings in Conception Bay South, up 7.7% from 2016. We are based here, so this is home ground.
Homes here range from long-established communities to new subdivisions. We assess the existing service before a renovation, heat pump or charger goes in.
Residential electricalIn June 2023, The Shoreline News reported that lots approved that year had passed 250, with Spruce Hill Road and Hopewell Gardens approved in principle. New homes need new services.
Design-build estimatingBasement flooding and power outages are both on the Town's own risk list. We wire sump pump circuits and standby generators on a transfer switch.
Emergency and service workThe Town offers four free public Level 2 chargers at Town Hall, Robert French Memorial Stadium and the CBS Arena. A home charger needs its own circuit.
EV chargingThe Gateway Commercial Park, the Conception Bay South Industrial Park and Long Pond Port are the Town's listed commercial areas. We plan fit-ups from service entrance to final circuit.
Turnkey electrical
The Town's adaptation plan names Stormageddon in 2020, Hurricane Igor in 2010 and Hurricane Leslie in 2012 as costly impacts, along with storm surges, wind storms and widespread power outages.
On 13 March 2026, equipment problems left more than 4,000 Newfoundland Power customers without power in Kelligrews, Foxtrap, Upper Gullies and Peachytown.

Electrical permits in Newfoundland and Labrador go only to registered electrical contractors, through the province. The Town lists mini-split and heat pump installs under a miscellaneous permit of its own.
We pull the electrical permit and book the inspection with the provincial authority.
Puffin Power is based in Conception Bay South. For an outage or a fault, call (709) 705-7680.
The Town's plan projects severe freezing rain events to increase 50% by 2100. The plan's actions include reliable on-site backup power for the Town's critical buildings.
The Town's plan lists sewage backups and basement flooding among projected impacts, and its adaptation actions mention sump pump installation and backflow valves.
Panels, sump pump circuits and standby generators should be placed with flood risk in mind. We assess that before wiring.
Tell us what you need done, and we will scope it and get it scheduled.