Panel and service upgrades
Wiring from that era was designed for fewer loads than a modern home carries. We replace panels and upgrade services to fit what the house needs next.
Residential electricalPuffin Power is based in Conception Bay South and serves the Avalon. For St. John's homes and commercial buildings, we plan and install the electrical work.
About 42% of St. John's housing was built between 1945 and 1980, according to the City's housing report. Heat pumps and EV chargers add load those panels were not sized for.
Wiring from that era was designed for fewer loads than a modern home carries. We replace panels and upgrade services to fit what the house needs next.
Residential electricalUnder its 2024 housing agreement with CMHC, the City has committed to allow secondary suites and more units per lot. A suite needs its own circuits, and sometimes a sub-panel.
Residential electricalA tenant fit-up in an older building starts with what the service can carry. We check capacity first, then plan lighting, power and panels as one job.
Turnkey electricalOur emergency coverage area is Conception Bay South and the Avalon. For storm season, we install standby generators on a transfer switch.
Emergency and service workThe City runs public Level 2 chargers at several sites, including the City Hall parking garage and Churchill Square. At home, a charger needs its own circuit and spare panel capacity.
EV charging
The City's housing report says construction in St. John's peaked in the 1970s, and single-detached houses are the largest share of homes. Services from that period were sized for fewer circuits.
Winter tests them. St. John's set a one-day snowfall record of 76.2 centimetres in January 2020 and declared a state of emergency. Freezing drizzle iced power lines in February 2024, and outages included parts of the city.

In St. John's the City issues electrical permits, only to electrical contractors it has licensed, and the City does the inspection. The permit must be in place before work begins.
The City's electrical by-law adopts the Canadian Electrical Code, 2024.
Since 1 January 2026, utility-supplied equipment must be installed before the service inspection. Contractors contact Newfoundland Power directly for it.
Newfoundland Power says a generator may connect to house wiring only through a properly installed, CSA-approved transfer switch, with an electrical permit and inspection. We handle sizing, the transfer switch and installation.
The City's electrical by-law says no one may cover electrical work that has not been inspected, and the Inspector must be told before work is enclosed.
The by-law also allows emergency repairs before a permit, if the permit is obtained within forty-eight hours, excluding weekends and statutory holidays.
Tell us what you need done, and we will scope it and get it scheduled.